which
was
held betiveen the Tandholder
and Sir Henry Festinger
in 18.4.4.
The time of the two Celertis is fully -occupied, during Office hours, in executing : The necessary documents Required for the Department, the Vouchers, pay lists, Reports and Estimates, Contracts, &c. for transmission home, a Chy for the Undite,
e for the office,
office, and one for the contractor .
one
The duties requisite to be performed by Mr. Pope, the Civil Engineer and block of
works, are very arduous, and the
arduous, and the greater
portion of the Hooks hov
having been executed.
by day : labour, or measured work, has necessarily entailed an additional quantity of work upon him to execute in the office, in the arrangement of the pay lists and the superintendence of the accounts, which Ihave much pleasure stating, he has tation great care and
in
trouble in
ina
have
classifying and arranging most satisfactory manner, this then has necessarily deprived me of much of hie
.
assistance
171
assistance in the preparation of drawing necessary for the various works, and as the department is still without a competent draughtsman, this work must of course be executed by myself, which has been one
which have obliged me to
to deter time to time orders which have been
of the
Causes,
from given for the preparation of new plans for
various works.
the
Sam still in arrears with the
proposed Tanks for the Toron, the Brawing, Reports and Estimates, for the Court house in Police
stations for Aberdeen and Victoria, and also for the working drawings and. specifications for the works at the Gad, Survey of the contemplated Road from the Albany Godowns to the Wongneichung Valley .. Much.
Much of our time must non- devoted to the perman
e pennanent arrangement of the streets, about to be proceeded. viz : the formation of the stone channels throughout the whole town,
with.
2200 em
now be
tes