under the last quoted (Roper & Estimate
In the Eastern District of Victorive the works crecuted, have been the sormation of Culverts to. Report and Estimate Nr.4 of 1844, all of which
- get quité complete, and in
are not
· not ye addition therets, the works with crized_ müünerizeda
under Report and Estimate Nr. 6 of 1845,
of completion, which
in are month
I hoke will be finished in one from the present date, Tucy comprise the construction of one 12 feet arch and one & foot arch, and the formations
feet
of the Road to the Required level, as_ shower the section accompanying
ONL
the Report ..
The cutting at the Gap hon stood Temarkably well during the last
year,
-11-0
slip of any magnitude occursed, but the surface of
having the Road.
Our
the Eastern side which
is very strep is frequently in want
of repair as the Read thevelcom
131
from is an
the
embankment ; and it is not safe to carry
water through it with a
th a drain; in fact a
drain was eriginally constineid half way between that point and the wooden Bridge,
completely
and in truture 1843 it was
destroyed in consequence of the teatrage
therefrome saturating th
material and
sink : but
causing the foundations to sink :
avertis art
neo in
in progress to correct the ag
rear degree by constructing catch water draises above, to curve the Road from
evil in a
the centre each was, to form 6 Seer broad pathinags and at intervals to form pipe
holle set in concrété le
from the surface.
con convey
and the
the water
couree down
the slope either woll sectded or chunamed. together with the improvement
This service
of the inclination has just been sanctioner under Report and Estimate . 1 1/4 of 1845.
it
As the gap is so high, 18 feet,
it would not be advisable to make a
decher
of