arücke. Nr 1.2. and 3 of that Report,

istimated at $ 1934 for labour, the : measuring 137/2 yards in length, and

being

Stone Drains under the Reads

estimated at $ 876.94 additional, per estimate No tof 1845. - a small quantity of work is yet required to complete these Roads, viz: grassing. slopes and the formation of side channels Ve, which will be executed: previous to the

the

Zainy

season.

The

Harbour Master's Wharf

and

d pier, Report

and Estimate Nr. 3 of 1844, was completed.

during

the

year last,

· past, and has ....

proved of great benefit and convenience to the community at large, it being accessible at all times of the tide, and

the only Public landing

is moreover

place at

- present in the Toron ; it

sustained no

damage during the year = The storm of the 7th of May carried away a portion of the (Bridge

which

137

Spans the Nullah at the North- Barractis as I anticipated, and as

detailed in my Report of the preceding year. This was Repaired by the Royal Engineer's Departinent; and the amount £ 109: 10: 8,

charged against the Colony. -

The Construction of a

Bridge 25 feet Span, Report and Estimate Nr. 6, is postponed until further orders, or

contil after the next tainy it would be dangerous

season, at

and difficult

to erect it during that time, as

the centering

would be liable to be carried away by the fresh sets during

execution of the work.

the

The portion of the Queen's Read in this District has lately been

put into good repair, and

Shope

sufficient to secure its preservation, the expenditure thereon being of sod 1. 20.

(£.91.18.4.).

Some additional works were

Requisite