be expedient to

use

any

Stores

old Materials belonging to the Public, it should be so stated in the Estimate, and at the end should be shown the deduction which

will arise therefrom.

Under these Instructions

it will be necessary to revise

some

of the

Estimates, and in No 2 to provide

for the work mentioned in

the Specification for the same,

which has been

omitted. Cells to be built

They recommend the use of

brick

instead of Stone, as there is an impression in England, that Store buildings in Tropical Climates are unhealthy that these Services, if ordered, should be executed by contract, except

the

Intimate No. 2 15. Specification

N°2. Plans of Variations

pr. m2+5.-

38

the digging and building for a Well at the residence of the Assistant Magistrate at Chek-Choo, which should be provided for

in

a

separate Report and in

Estimate

on an

agreed price to be

dug,

and

paid for by

measurement on an

assumed depth.

I return the original

Documents forwarded to me.

(Signed) Edward Aldrich,

Major Comg R. and Jupt Engineer

(Fine Copy)

Frederick M.A. Brun

Share This Page