43

showed aptitude, they were given training, placing an unskilled man with a skilled man.

On 15th September, members of the 69th Company CLC, consisting of 5 officers, 14 British NCOs and 476 Chinese arrived and these were followed, on 10th October by 5 officers, 14 British NCOs and 476 Chinese of the 90th Company CLC.

Though a large part of the Chinese personnel was absorbed by Central Workshops more than half the total number were used on other duties by the Labour Group HQ for work elsewhere in the Tank Corps Area.

Prior to the Battle of Cambrai in which tanks were first deployed, the Chinese manufactured 400 fascine bundles and 110 sledges. Each fascine had to be chopped to the recognised length, at one time 60 axes were being used and each bundle consisted of from 60 to 100 fascines. For tightening the bundles, 18 specially equipped tanks were used. Between 15 to 20 Chinese were required to move each bundle, often through mud and in bad weather. Members of the 51st Company CLC were employed in this operation.

In January 1918, the establishment of workers was short by about 225 men, with no prospects of receiving technical reinforcements. This problem was discussed by Lt Col. Brockbank, CO of Central Workshops and Section Commanders and it was decided that, for those who showed a tendency for training as fitters and riveters, etc., would be given a trial. It became apparent that the average skilled Chinese excelled at repetitious work, being interested and not subject to interference. They were thus employed on salvage repair work and rough fitting on manufactured articles.

Work in the Tank Repair Section was found more difficult until a squad of Chinese was trained specifically for one particular job, e.g. detracking, derollering, dismantling and assembling sprockets and pinions. The small track riveting shop was run entirely by the Chinese, with excellent results. The monthly average was 4700 plates from 4 gap riveting machines. When moved to Teneur, where there were 6 machines, output increased to 7480 plates per month.