133

ger ferry service direct to Hong Kong has already been established, and airports at Haikou and Sanya are being up-graded to international standard for direct air links with Hong Kong. A 50-km railway link will complete the link between Ba Suo, Lintau and Yulin. For energy, an open-cut mine will be developed at Changpo with capital investment of US$ 60 million (Bulletin, May 10, 1983) and the estimated output of 500,000 tonne of coal will be used at power stations at Changpo and Haikou (China Daily, November 25, 1983).

The projects which the Hainan authorities would like to proceed as joint ventures with foreign capital are listed in Table 1 (Anon., 1982a). These projects were presented to the Australian Department of Trade as being indicative of the range of the island's ambitions rather than as specific projects to which they

Product Location size Comments Cement Dong Fang 1 Mt/a Export through Basuo. Petroleum refinery West Coast 1 Mt/a Based on expectations of offshore oil. Silicon carbide Dong Fang 15000 tpa Based on planned hydro expansion on Changhua River. High quality silica sand. Plate glass Daxian Rebuilding of facilities. Paper Daxian Aluminium 30000 tpa Long-term ambition. Tourism Five potential locations. Tropical agriculture Sugar cane, pineapple, cashews, coffee, cocoa macadamia nuts, beef and dairy cattle. Fish, prawns 27 sites available for fish farms.

Page 150

Page 151

Share This Page