APPENDIX Y

Contd.

Project

Estimated

Cost

Construction of roads & drains C.W.I.L. 58 & 59,

On Yip Street, Chai Wan

190,000

Construction of footpath and drains I.L. 8328 &

8329, Moorsom Road

120,000

Construction of stormwater drains - Ap.I.L. 90,

South of Aplichau

720,000

Construction of roads and drains, Aberdeen Swimming

Pool, Shum Wan Road

470,000

(ii) Kowloon

Chatham Road Interchange

- provision of U-Turning Loop

1,200,000

Kwun Tong Road/Hip Wo Street - grade separated

intersection

26,000,000

- Airport tunnel road Kowloon Bay reclamation to Kwun

Tong Road, Stage I (site investigation and ground level road works)

6,700,000

Kwun Tong Road/Lai Yip Street grade separated

intersection, stage I - works at ground level and associated with Mass Transit Railway

25,600,000

Northern elevated road from Ngau Tau Kok to Kowloon Bay-construction of foundations within the Mass Transit Railway depot area and ground level road-work at Kwun Tong Road/Ngau Tau Kok Road junction

5,900,000

Kowloon City interchange improvements

29,000,000

Lung Cheung Road reconstruction (Lion Rock interchange

to Nam Cheong Street interchange)

3,200,000

Ching Cheung Road reconstruction

2,300,000

West Kowloon Corridor

Gascoigne Road to Tong Mi Road

J

- Stage I elevated Road -

41,000,000

Salisbury Road extension

11,500,000

Elevated road Prince Edward Road to Lai Chi Kok Road

29,200,000

231

Share This Page