APPENDIX X

-

Contd.

Approximate

Cost

$

Widening of the existing narrow road to rural road standard at Lam Kam Road between J/0 Tsuen Kam Road and Yuen Long District Boundary

Construction of roads, side lane and associated drainage works at Y.L.T.L. 174 and 175 near On Hong Road, Yuen Long

Construction of road works and associated drainage works at Y.L.T.L. 120, Ma Miu Road, Yuen Long

127,000

109,000

125,000

Construction of drainage works at Lot No. 667 in D.D. 4, Silvermine Bay, Lantau

119,000

Construction of carriageway, footpath and associated drainage works to serve Y.L.T.L. 120 and 135, Yuen Long Town

132,000

Construction of carriageway, footpath and associated drainage works to serve Y.L.T.L. 119, Yuen Long

122,000

Construction of carriageway, side lane, footway and associated drainage works at Y.L.T.L. 88, Kik Yeung Road, Yuen Long

114,000

Sok Kwu Wan

-

Mau Tat Village Footpath, Lamma Island

472,000

-

Tai Wan Ma On Shan, Stage I (Tai Wan to Kei Ling Ha Lo Wai)

2,637,000

Kwai Chung Development, Areas 10B and 10E (part) Roads and Drainage

1,973,000

Kwai Chung Development Main Sewer in Area 10H

595,000

Tsuen Wan (North), Roads and Drains

4,099,000

Tsuen Wan West Bus Terminus

722,000

Construction of Coffin Burial Terraces and Access Road, Wo Hop Shek Cemetery 7th Contract

1,162,000

Construction of Coffin Burial Terraces, Wo Hop Shek Cemetery

115,000

Desilting Kam Tin River

240,000

217

Share This Page