APPENDIX X-Contd.

Project

Estimated Cost

$

Un Chau Street Reconstruction 1,120,000 Princess Margaret Road/Wylie Road Junction Improvements... 1,800,000 Extension of Ho Man Tin Hill Road to Wylie Road 960,000 Kwun Tong---Combined Ferry Concourse 3,360,000 Bus Terminus off Yue Man Square, Kwun Tong 520,000 Public Light Bus Terminus, Ferry Street, Kowloon 590,000 Footbridge over Choi Hung Road south of Shatin Pass Road ... Final Surfacing of Tung Yuen Street, Shung Tak Wai, Shung Wo Path and Yan Yue Wai 500,000 ... 310,000 Reconstruction of Tonkin Street (between Castle Peak Road and Po On Road) ... ... 185,000 Reconstruction of Pak Tin Street (between Woh Chai Street and Berwick St.) 150,000 ... ... Reconstruction of Grampian Road (section between House No. 29 and Dumbarton Road) 180,000 Reconstruction of Tsui Ping Road (section between Resettlement Block No. 1 and No. 2) 120,000 Reconstruction of Un-named Road adjacent to Kai Tak Airport 105,000 Reconstruction of Tung Chau Street (between Cheung Sha Wan Road and Castle Peak Road) and Kiu Kiang Street (between Un Chau Street and Cheung Sha Wan Road) 360,000 ... ... Reconstruction of Cox's Road 400 ... 256,000 Reconstruction of Liberty Avenue (from Peace Avenue to Victory Avenue) 110,000 ... ... Construction of Shun Ning Road and Po On Road (half width between Cheung Fat Street and Wing Lung Street) 198,000 Construction of 15" dia. and 12" dia. sewer in Hammer Hill Road (from Ka Wah Terrace to N.K.I.L. 5313) ... ... 199,000 Final Surfacing of Shung Shun Street and Cha Kwo Ling Road (from Shung Shun Street to Ko Chiu Road) 317,000 Lam Tin Resettlement Estate Area 'A'-Roads, Drains and Surfaces ... ... 2,700,000 Sau Mau Ping Resettlement Estate-Roads, Drains and Surfaces 7,950,000 Cross Harbour Tunnel Road Connections, Kowloon ... Austin Road Extension, Substructure in Toll Plaza 14,998,000 Austin Road Extension-Bus Interchanges and Foundations for Permanent Footbridge 1,160,000 ... ... ... 540,000. Temporary Steel Flyover in Prince Edward Road 2,568,000

(iii) New Territories

Luk Keng-Tai Mei Tuk Road, Stage II-Chung Mei to Wu Kau Tang-Road Formation and Main Drainage 4,140,000 Sai Kung Reclamation-Roads and Drainage, Stage I... 830,000

201

Share This Page