APPENDIX Y-Contd.
Project Estimated Cost $ Construction of half of Palm Street and Access Lanes in two undeveloped areas in Tai Kok Tsui ... ... ... ... ... Ho Man Tin Low Cost Housing Estate-Roads, Drains and Surfaces 140,000 Ko Chiu Road Low Cost Housing Estate-Roads, Drains and Surfaces 1,700,000 Pak Tin Resettlement Estate-Roads, Drains and Surfaces 3,700,000 Lam Tin Resettlement Estate Area 'A'--Roads, Drains and Surfaces 2,820,000 Lam Tin Resettlement Estate Area 'B'-Roads, Drains and Surfaces 2,720,000 ... ... ... 3,000,000 ... 8,000,000 Sau Mau Ping Resettlement Estate Roads, Drains and Surfaces 3,200,000 ... ... Yau Tong Resettlement Estate-Roads, Drains and Surfaces 1,200,000 Austin Road Extension-Substructure in Toll Plaza 20,400,000 Cross-Harbour Tunnel Road Connections, Kowloon ... (iii) New Territories ... ... ... ... Luk Keng-Tai Mei Tuk Road, Stage III, Phase I-Wu Kau Tang to Luk Keng 3,300,000 Kwai Fong Government Low Cost Housing Estate-Roads, Drains and Surfaces-Phase II 2,178,000 ... ... High Island Roads-Improved Standards (undertaken by Waterworks Office) 4,030,000 Sha Tin/Siu Lek Yuen Road (undertaken by Waterworks Office) ... Luk Keng-Tai Mei Tuk Road, Stage I (from Tai Mei Tuk to Chung Mei)-Additional Road Embankment Protective Works 3,880,000 Luk Keng-Tai Mei Tuk Road, Stage II-Chung Mei to Wu Kau Tang-Road Formation and Main Drainage 1,137,000 Construction of Roads and Drains within Area 10D, Kwai Chung T Kwai Shing Government Low Cost Housing Estate-Roads, Drains and Surfaces-Stage III 4,028,000 ... 3,705,000 ... ... Kwai Shing, Kwai Hing and Lei Muk Shu Government Low Cost Housing Estates Completion of Surfacing of Roads, Car Parks and Recreation Grounds 1,438,000 ... 1,572,000 Sai Kung Reclamation--Roads and Drainage, Stage I 880,000 Link between Kwai Fong Government Low Cost Housing Estate, Kwai Chung and Gin Drinker's Bay Road 120,000 Construction of Coffin Terraces and Access Road, Wo Hop Shek Cemetery Third Contract 866,000 ... ... ... ... Construction of Coffin Burial Spaces in Cheung Chau Public Cemetery-Phase II ... Construction of the Access Road to New Mental Hospital-Siu Lam 140,000 Approach Roads to Tsing Yi Bridge-Tsing Yi Road Embankment 1,144,000 ... ... ... ... Roads to Tsing Yi Bridge-Tsing Yi Road Embankment 800,000 ... 195