completed, the Centre will provide training facilities for 170 boys and will include classrooms, workshops, assembly/mess hall, sick bay, laundry, offices, staff club room, residential units and staff quarters.
4.54 The construction of two single-storey blocks of Warders' Quarters at Chi Ma Wan Prison and the addition of Toilet Blocks to seven existing dormitories at the same prison was completed, whilst two 4-storey buildings and one single-storey building providing a total of 16 Type IV and 4 H grade married officers quarters were under construction at Tai Lam Treatment Centre.
4.55 The Site Formation work for a Maximum Security Training Centre and a new Prison, both at Pik Uk, Clearwater Bay Road, was also under way at the end of the year.
Urban Services Buildings and Recreation Areas
4.56 The Swimming Pools complex at Lei Cheng Uk was completed during the year. This complex comprises eight pools and a building housing changing, toilet and refreshment facilities. A similar Swimming Pools complex is under construction at Kennedy Town. A further similar complex and recreation ground at Kwun Tong, although completed just prior to the commencement of the year under review, was officially opened by H.R.H. the Princess Anne on 30th October, 1971. The cost of all of these Swimming Pools complexes is being met by the Royal Hong Kong Jockey Club.
4.57 Work was completed on a Sports Ground at King's Park, playgrounds at Cheung Sha Wan and Sham Tseng and Stage I of Hoi Sham Park, To Kwa Wan. Several other small playgrounds or parks of varying sizes were completed and work was proceeding on others as part of the continuing programme for the provision of recreation areas for both adults and children. A number of minor improvements to existing facilities were also carried out, including the provision of flood-lighting in a number of parks and playgrounds in both the urban and rural areas.
4.58 Two beach buildings, one at Cheung Chau and one at Clear Water Bay Beach, were completed.
4.59 Four public latrines and a bathhouse with latrine attached were completed and ten other latrines or bathhouses were under construction in various locations.