Page 48

Committee Representative(s)

Standing Committee on Architectural and Civil Engineering Conditions of Contract Government Quantity Surveyor (Chairman)

Building Construction and Civil Engineering Sub-Committee of the Metrication Committee Government Quantity Surveyor (Chairman)

Metrication Committee, Hong Kong Public Works Department/Building Contractors Association Joint Committee Government Quantity Surveyor Government Quantity Surveyor

Buildings (Alterations, Additions and Improvements) Committee Government Maintenance Surveyor Chief Architect, Division II

Building Trades Industrial Committee of the Industrial Training Advisory Committee Chief Architect, Division II (Chairman)

Committee on Design Requirements for Handicapped People Chief Architect, Division II Chief Architect, Division III

Sites and Buildings Sub-Committee of the Polytechnic Planning Committee Chief Architect, Division III (Chairman)

Resettlement Programme Committee Government Low Cost Housing Programme Committee

ARCHITECTURAL DIVISIONS

Chief Architect Division I: Edwin WONG, B.Arch. (N.Z.), A.N.Z.I.A., A.R.I.B.A. (Acting)

Chief Architect Division II: J. B. AITKEN, D.A. (Edinburgh), A.R.I.B.A. H. C. ASTBURY, A.A.Dip., A.R.I.B.A. (Acting)

Chief Architect Division III: C. BRAMWELL, Dip.Arch. (Dunelm), A.R.I.B.A. H. C. ASTBURY, A.A.Dip., A.R.I.B.A. (Acting) J. LEI Meng-can (Acting)

Chief Architect Division IV: C. CHATWIN, D.A. (Dundee), A.R.I.B.A., A.R.I.A.S. D. V. TONGE, Dip.Arch., A.R.I.B.A. (Acting)

4.08. All four Architectural Divisions are engaged on new works and each is headed by a Chief Architect. Divisions I and II are each sub-divided into three groups headed by a Senior Architect, each group forming a working team capable of handling the whole process of designing the buildings and preparing the architectural drawings for

Page 37

Share This Page