DEVELOPMENT & AIRPORT DIVISION
1. PREPARES FEASIBILITY REPORTS ON MAJOR DEVELOPMENT SCHEMES FOR KOWLOON AND THE NEW TERRITORIES.
2. DESIGNS AND CARRIES OUT MAJOR SITE FORMATION WORKS IN KOWLOON AND THE NEW TERRITORIES.
3. SUPERVISES PUBLIC DUMPING ON RECLAMATIONS IN KOWLOON AND THE NEW TERRITORIES.
4. PRELIMINARY PLANNING, CO-ORDINATION, DESIGN AND CONSTRUCTION OF ALL CIVIL ENGINEERING WORKS REQUIRED FOR THE NEW TOWN OF SHATIN, PRIOR TO THIS WORK BECOMING EXPANDED INTO A SEPARATE DIVISION.
5. PRELIMINARY PLANNING, CO-ORDINATION, DESIGN AND CONSTRUCTION OF ALL CIVIL ENGINEERING WORKS REQUIRED FOR THE NEW TOWN OF CASTLE PEAK.
6. PLANNING, CO-ORDINATION, DESIGN AND CONSTRUCTION OF CIVIL ENGINEERING WORKS IN CONNECTION WITH AIRPORT DEVELOPMENT AND MAINTENANCE.
PORT WORKS DIVISION
1. DESIGNS, CONSTRUCTS AND MAINTAINS ALL PUBLIC PIERS AND SEAWALLS.
2. CHECKS PLANS OF PRIVATE MARINE WORKS.
3. MAINTAINS OR INCREASES AS REQUIRED THE DEPTH OF THE HARBOUR.
4. ARRANGES FOR THE APPROVAL OF PUBLIC AND PRIVATE RECLAMATIONS.
5. DESIGNS AND CARRIES OUT MAJOR SITE FORMATION WORKS ON HONG KONG ISLAND.
6. SUPERVISES PUBLIC DUMPING ON RECLAMATIONS ON HONG KONG ISLAND.
7. PREPARES FEASIBILITY REPORTS ON MAJOR DEVELOPMENT SCHEMES FOR HONG KONG ISLAND.
QUARRIES SECTION
THE ADMINISTRATION AND OPERATION OF GOVERNMENT QUARRIES FOR THE PRODUCTION OF CRUSHED STONE AND BITUMEN COATED MATERIALS AND THE ADMINISTRATION OF LONG-TERM PRIVATE QUARRIES ON CONTRACT.
DRAINAGE WORKS DIVISION
1. PLANS, DESIGNS, INVESTIGATES AND CONSTRUCTS SEWERAGE, SEWAGE DISPOSAL AND STORMWATER DRAINAGE.
TECHNICAL TRAINING UNIT
PROVIDES SITE SUPERVISION TRAINING FOR BOTH NEW RECRUITS AND SERVING STAFF.
55
RAILWAY SECTION
PLANS, DESIGNS AND CONSTRUCTS THE NEW KOWLOON CANTON RAILWAY TERMINUS AT HUNGHOM AND ASSOCIATED RAILWAY ENGINEERING WORKS IN KOWLOON AND NEW TERRITORIES.
P.W.D. LABORATORY SECTION
CARRIES OUT TESTS AND ISSUES REPORTS AS NECESSARY ON A WIDE RANGE OF MATERIALS FOR THE DEPARTMENT AND FOR PRIVATE ORGANISATIONS.
Page 75
Page 76