APPENDIX Y—Contd.

Project Estimated Overall Cost $ Kowloon and New Kowloon Yau Tong Supply, Stage III (Construction of Salt Water Pump House and Reservoir) 4,444 Salt Water Flushing System: Kwun Tong-Jordan Valley Kowloon East Salt Water System (Pumping Station and Additional Mains) 1,823,000 Kowloon West Salt Water System, Stage I 1,390,000 3,650,000 Salt Water Flushing Scheme: Sau Mau Ping 900,000 Decking of Wong Tai Sin Service Reservoir for Recreational Purposes ... 2,400,000 Ho Man Tin Development Supply, Stage II 600,000 6,500,000 Kwun Tong New Town Supply: Housing Zones 13 and 14 470,000 Yau Tong Supply: (1) Stage II (Extension of Trunk Feed and Construction of Fresh Water Service Reservoir) 3,750,000 (3,100,000) Kowloon South Salt Water Flushing System, Stage I 900,000 New Territories Castle Peak Supply, Raw Water Feed ... Plover Cove Scheme, Stages I and II Works 541,000,000 Shek Pik Scheme 263,560,000 Sheung Shui/Tai Po Supply, Stage II 11,000,000 Yuen Long Balance Tank and Pipeline 3,200,000 Yuen Long Water Supply 1,370,000 72,000,000 Tsuen Wan/Kwai Chung Development Supply 3,000,000 Sha Tin Trunk Main 15,400,000 Castle Peak Supply, Stage 1A 172,000 ... Minor Works selected from Appendix VI, Category D ... Tsing Lung Tau Unfiltered Supply 850,000 East River Shum Chun Scheme 4,524,000 1,200,000 Cheung Chau Water Supply, Stage III 900,000 Tai Po Ting Kok Water Supply 280,000 Pat Heung Water Supply 160,000 Provision of Temporary Increased Pumping Capacity at Sha Tin Treatment Works ... 152
Share This Page