APPENDIX P-Contd.

Project

Estimated Cost

$

(b) Port Works (Contd.)

Wan Chai Reclamation, Stage I 24,500,000 Aberdeen Southern Breakwaters 14,000,000 Wan Chai Cargo Handling Basin, Breakwater Arm 4,000,000 Aldrich Bay Breakwater 14,000,000 Incineration and Composting Plant, Kowloon 28,600,000 Second Incinerator in Kowloon 17,000,000 Cheung Sha Wan Reclamation, Stage II ... 2,700,000 Cha Kwo Ling Seawall, Stage II 4,000,000 Tai Wan Seawall, Stage I 700,000 Yau Ma Tei Slipway Reprovisioning, Stage I (Pier & Slipway)... 6,773,000 Kowloon Bay Seawall, Part II 2,000,000 Tai Wan Seawall, Stage II ... 800,000 Shuen Wan Typhoon Shelter 5,500,000 Pier at Ap Chau, Sha Tau Kok 350,000 Sai Kung Typhoon Shelter (Yim Tin Tsai), Stage I 2,000,000 Feasibility Study of a Proposed Container Terminal at Kwai Chung 750,000 Demolition of Ngai Kap Pai Reef ... Light Beacons at Shek Kwu Chau, Pak Kok, Luk Keng and Kau Yi Chau 120,000 Light Beacons at Lau Fau Shan, Siu A Chau and Northwest Tsing Yi Island 40,000 Cover for Peng Chau Public Pier 30,000 ... 75,000 Wharf at Stonecutter's Island 700,000 Cattle Pier at Cheung Sha Wan 800,000 Waterfront Road at Victoria Park (Seawall) 3,200,000 Seawall at Wan Chai Reclamation, Stage II, Section (N)-(6A) 1,700,000 Site Formation and Seawall for Sewage Works at Pillar Island, Kwai Chung 1,600,000 Site Formation at Aberdeen Resettlement Estate 2,040,300 Construction of Seawall Foundation and Dredging of Approach Channel for Castle Peak New Town, Stage IA 1,400,000 Pumphouse at Yau Ma Tei Typhoon Shelter 700,000

(c) Development Works

Stormwater Culvert Extension at Cheung Sha Wan Reclamation 3,350,000 Construction of Railway Workshops and Ancillary Works Resiting the Railway Terminus, Preliminary Works 11,320,000 ... 1,950,000

139

Share This Page