APPENDIX P-Contd.

Project

Estimated Cost

$

(ii) Kowloon (Contd.)

Sau Mau Ping Resettlement Estate-Roads, Drains and Surfaces ... Tsz Wan Shan Resettlement Estate-Roads, Drains and Surfaces 8,000,000 Yau Tong Resettlement Estate-Roads, Drains and Surfaces 10,300,000 Un Chau Street Low Cost Housing Estates-Roads, Drains and Surfaces 3,200,000 Shek Kip Mei Resettlement Estate Extension (Pak Tin Resettlement Estate)-Roads, Drains and Surfaces 1,300,000 ... 2,800,000

(iii) New Territories:

Shing Mun River Flood Control Scheme-Stage I, Phase II 780,000 Completion of Road to Junk Bay, Stage I (Lei Yue Mun Road to Sau Mau Ping) 1,620,000 Sewage Treatment Works at Pillar Island, Site Formation 1,600,000 Footbridge at Castle Peak Road near Tai Wo Hau 150,000 Access Road at Fo Tan 420,000 ... ... Footbridge at Tung Chung, Lantau 75,000 Kwai Chung Area 9-Resettlement and Low Cost Housing Estates, Roads, Drains and Surfaces 1,746,000 ... ... Access Road to Sha Tin Clinic and Maternity Home 55,000 Civil Engineering Office Radio Network-Repeater Station, Tate's Cairn 25,000 Kwai Shing Government Low Cost Housing Estate-Roads, Drains and Surfaces, Stage I 1,785,000 Castle Peak Road Improvement, Castle Peak to Ping Shan-Stage I 4,936,000 Kwai Chung Industrial Area 27, Final Surfacing of Roads 1,557,000 Surfacing of Hok Tau Access Road 238,000 Maintenance Works at Private Quarry Site, Tsing Lung Tau, M.S. 141, Castle Peak Road ... Plover Cove Water Scheme, Stage II, surfacing of Access Roads 86,000 ... 230,000

(b) Port Works

Incineration Plant, Hong Kong Island 21,110,000 Central Reclamation, Stages II & IV 19,700,000 Chai Wan Seawall, Stage I 8,000,000 Sandy Bay Reclamation, Stage II ... ... 5,700,000 138
Share This Page