APPENDIX O-Contd.

Project Approximate Cost $

...

(i) Hong Kong (Contd.)

Wan Chai Ferry Concourse and Access Road

Slope Protection at Tin Wan Hill Road, Tin Wan Resettlement Estate

Extension to Stormwater Drains in Central Reclamation, Stage IV

234,000 106,000 247,000

Construction of Main Drainage, Wah Fu Estate, Stage I

Reconstruction of Kin Wah Street

Extension of Stormwater Drains, Phase II in Central Reclamation, Stage II

423,000 112,000 523,000

Reconstruction of Peak Road near Magazine Gap

Reconstruction of Road and Nullah-Sing Woo Road

Improvement Works to Stream Course and Culvert, Ming Yuen Western Street and Tin Hau Temple Road Arran Street).

199,000 301,000 132,000

...

(ii) Kowloon:

Choi Hung Road Improvements

Kwun Tong Road, Stage I...

Reconstruction of Nathan Road (Chang Sha Street to Road from Tsim Sha Tsui to Airport-Chatham Road/Ma Tau Wei Road Junction Improvements, Stage I (Signals Scheme) Waterloo Road, Extension to Lung Cheung Road Wong Tai Sin Bus Terminus

2,560,000 3,800,000 1,200,000

Reconstruction of Tung Chau Street (parts) and Kwong Lee Road (part)

550,000 1,000,000 710,000 315,000

...

...

Road through Lion Rock Tunnel (Total overall cost)

Shek Lei Resettlement Estate-Roads, Drains and Surfaces

Ngau Tau Kok Resettlement and Low Cost Housing Estates-Drains, Roads and Surfaces, Stage II

8,950,000 2,131,000 1,658,000

Ngau Tau Kok Resettlement and Low Cost Housing Estates-Roads, Drains and Surfaces, Stage III...

Tsz Wan Shan Resettlement Estate and Exchange Areas--Roads, Drains and Surfaces, Stage VI...

729,000 543,000

...

Reconstruction of Granville Road and Humphreys Avenue and Sewer Duplication at Cameron Road/Carnarvon Road and Granville Road

Cheung Sha Wan Resettlement Estate-Roads, Drains and Surfaces, Stage I

Kwun Tong Housing Zone 10-Drainage and Roads

434,000 562,000 1,000,000

...

...

126

Share This Page