(ii) Kowloon (Contd.)

APPENDIX K-Contd.

Project Estimated Cost
$ Temporary Hung Hom Ferry Concourse 570,000 Kwun Tong Sewerage Scheme 6,750,000 ... 1,350,000 ... 3,490,000 ... 4,926,000 ... ... ... 380,000 ... 800,000 ... 550,000 DAD 750,000
1,200,000 ... 700,000 ... ... ... 520,000
2,500,000 ... ... ... 2,986,000
728,000 Road from Tsim Sha Tsui to Airport: Chatham Road Widening (Salisbury Road to Gascoigne Road) ... ... ... ... ... ... ... South Kowloon Peninsula Sewerage Scheme-66" dia. Submarine Outfall ... Tai Po/Castle Peak Road Link (Ching Cheung Road) 1,850,000 Construction of Western Half of Waterloo Road Extension 650,000 Roads and Ancillary Drainage at To Kwa Wan Reclamation ... Roads from Tsim Sha Tsui to Airport: Chatham Road/Ma Tau Wei Road Junction Improvements, Stage I (Signals Scheme) 1,400,000 Tai Kok Tsui/Yau Ma Tei Sewerage District Development-Tai Hang Tung Road Sewer ... Reconstruction of Nathan Road, Stage V ... ... ... ... ... Lai Chi Kok Road/Nathan Road Junction Improvement 1,450,000 Reconstruction of Waterloo Road (Boundary Street to the approach ramp of the flyover at Nairn House Intersection) 300,000 Princess Margaret Road Improvement 5,000,000 Flyover at Waterloo Road/Argyle Street/Princess Margaret Road Junction 257,000 ... 1,000,000 Construction of Ventilation Houses for Lion Rock Tunnel 10,000,000 Road construction work on Sha Tin Tunnel Approach Road-South Portal to Lung Cheung Road 1,546,000 Boundary Street/Tai Po Road/Cheung Sha Wan Road Junction Improvements 1,687,000 ... ... ... ... Resettlement Estate at Kwai Chung Area 'C'-Roads and Drainage ... Resettlement Estate at Tai Wo Hau-Roads and Drainage ... Resettlement Factories at Kwai Chung Central-Area 28-Drains, Roads and Surfaces ... Resettlement Estate at Lei Muk Shu-Roads, Drainage and Surfaces, Stage I ... Resettlement Estate at Pak Tin-Construction of Stormwater Drain ... ... ... ... ... Resettlement and Low Cost Housing Estates at Ngau Tau Kok--Roads, Drains and Surfaces, Stage II ... Resettlement Estate at Tsz Wan Shan-Roads, Drains and Surfaces, Stage V ...

(iii) New Territories:

... ... ... ... Kwai Chung Development Areas 17 and 29 (part)—Drainage and Roads-Road and Drainage Works in Area 29 Kwai Chung Stage I 112 Kwai Chung Development Areas 17 and 29 (part)-Drainage and Roads-Road and Drainage Works in Area 29 Kwai Chung Stage II 1,850,000 ... 650,000 ... 1,400,000
Share This Page