APPENDIX J-Contd.

Project

(ii) Kowloon (Contd.)

Estimated Cost

$

Resettlement Estate at Shek Kip Mei-Drains and Roads Resettlement Estate at Yau Tong Drains and Roads, Stage II

...

...

...

...

...

Resettlement Estate at Kwai Chung Central Area 'C' drains, roads and surfaces, Stage II and Stage III Resettlement Estate at Tai Wo Hau-drains, roads and surfaces

1.

...

Resettlement Estate at Wang Tau Hom-Drains, roads and surfaces

...

Resettlement Flatted Factories Nos. 5 and 6 at San Po Kong-drains, roads and surfaces...

...

360,000

...

...

892,000

1,400,000

1,450,000

3,944,000

...

160,000

Resettlement Department Staff Quarters for Lo Fu Ngam and Wang Tau Hom Estates-drains roads and surfaces

100,000

(iii) New Territories:

...

Road and drainage works in flatted factory at Yuen Long Road and drainage works in Resettlement Estate at Yuen Long

640,501

...

...

801,917

Kam Tin Road Widening (through Kam Tin)

543,300

Tsuen Wan Bus Terminus

Yuen Long Flood Control, Stage II

250,000

...

2,429,700

Yuen Long Flood Control Stage V and Shan Ha Road Sai Kung to Tai Mong Tsai Feeder Road Widening, Stage I (Sai Kung to Tai Wan)

3,448,200

...

...

713,300

Texaco Road Improvements, Stage III (Cemetery Road to Seawall)

...

370,300

Road Works on Refuse Dump in Gin Drinker's Bay

128,600

(b) Port Works

Site formation at Aberdeen Resettlement Estate Temporary Sand Depot, Kwun Tong

...

2,040,300

111,219

Alteration to Kweilin Street Refuse Pier

...

24,818

Dredging to improve natural anchorage at Tai O Creek Navigation Light at Shek Kok Tsui Lamma Island

685,595

28,515

Seawall

Silverstrand Beach...

Tai Long Pai Flashing Beacon

...

...

75,795

...

64,617