6.06. Access platforms in the main plant room and a special dryer for compressed air for the radiological machines were completed, together with a re-use of water system and soap, alkali, sour and bleach systems for use with the laundry.

Queen Mary Hospital Extensions

6.07. A kitchen newly located at roof level was equipped with existing appliances, together with additional modern steaming ovens and hot closets. All installation work was carried out by direct labour.

6.08. In connection with the new Operating Theatre Block, the Professorial Block and the Radiodiagnosis Block, contract drawings for steam, fuel oil and compressed air services were prepared, together with a specification.

6.09. All plant and fittings for the mechanical services were ordered by indent, including two 7,500-lb/hr. package-type steam boilers and five 500-gallon storage pattern calorifiers.

6.10. A 450-K.W. generator driven by a 600-hp Blackstone diesel engine was purchased by indent and installed by direct labour. This will provide an emergency power supply throughout the hospital.

Kowloon Hospital Rehabilitation

6.11. Drawings were prepared for the extension and improvement of steam and hot water services. Additional hot water boilers and calorifiers were purchased and installed by direct labour.

6.12. A contract was let for the installation of a fuel oil system to serve 'M' Block and the Sisters' & Nurses' Quarters.

6.13. Details for extending the main boiler house were agreed upon with the Architect.

6.14. A proposal outlining the additional steam plant which would be required for a new 500-bed block was submitted to the Architectural Office.

Waglan Island Lighthouse

6.15. A contract was let for the supply and installation of two 50-K.W. diesel-driven generators to meet the extended domestic power requirements on the island and for running the radio station and lighthouse.