Page

Period

1948-1949

1949-1950

1950-1951

...

...

1951-1952

:

1952-1953

...

1953-1954

...

1954-1955

1955-1956

...

...

...

1956-1957

1957-1958

:

:

...

1958-1959

1959-1960

1960-1961

1961-1962

1962-1963

1963-1964

1964 1965

General

...

...

...

...

...

-

:

:

**

:

:

1.

...

...

...

...

...

...

:

Grand Total ...

SURVEY DIVISION

:

Total

$ 5,899,829.48

4,786,501.68

5,973,388.87

4,573,828.15

5,446,706.77

6,058,572.67

11,919,722.96

13,673,931.93

15,392,933.92

...

28,756,168.20

32,726,785.88

25,041,654.85

75,458,112.50

107,225,301.38

234,402,780.18

207,157,985.13

1

...

143,295,983.24

$976,843,392.26

Assistant Superintendent:

A. R. GILES, A.R.I.C.S., F.V.I., F.R.G.S.

5.29. The principal feature of the past year's progress has been the increasing importance of the air survey commenced in 1963. The flow of completed large-scale contoured plans from the contractors, Messrs. Hunting Surveys Ltd., is steadily increasing.

5.30. In addition to the current mapping programme at 1/600 scale (in the urban areas) and 1/1,200 scale (in the New Territories) the air-photographs have been used to produce photogrammetrically large-scale site plans for the Architectural and Engineering sub-departments in preparation for large site-formation contracts at Tsuen Wan, Kwai Chung, Castle Peak and Tsing Yi Island at a great saving in time and cost as compared to the traditional ground survey methods.

Revision of 1/25,000 Series of Maps

5.31. In December the Colony was re-photographed from the air by Messrs. Hunting Surveys Ltd. The new photography was primarily at high level with a view to revising the existing 1/25,000 series of military maps, which are badly out of date.