Additional Salt-Water Flushing Supplies at Aberdeen
10.43. A start was made on the laying of 5000′ of 10″ and 15″ diameter asbestos-cement pipes. Quotations for the supply of pumping equipment were invited.
Pok Fu Lam Water Supply Stage 1-Queen Mary Hospital
10.44. Realignment of Victoria Road to make room for the new Telegraph Bay Pumping Station was completed and design of the pumping station and plant layout was commenced.
Pok Fu Lam Water Supply Stage II
10.45. Survey and site investigations for the 2-million-gallon Kai Lung Wan Service Reservoir were completed and design begun.
Chai Wan Distribution System
10.46. Mainlaying proceeded in conjunction with the formation of new roads.
Enlargement of Distribution Mains in Stubbs Road Area
10.47. Mainlaying was begun in Stubbs Road between Shiu Fai Terrace and Tung Shan Terrace.
Choi Hung Estate Water Supply
10.48. Fresh- and salt-water mains continued to be laid as required by development.
Kwun Tong New Town Water Supply
10.49. Fresh- and salt-water mains continued to be laid in the housing zones, commercial centre and industrial zones as required by development and in conjunction with road works.
Kwun Tong High-Level Supply
10.50. Construction work on the 6 m.g. fresh- and the 0.5 m.g. salt-water service reservoirs proceeded and excavation of the sites were almost completed together with about 80% of the main mass-concrete walls. Concreting of column footings and invert slab was started. The design of the Shum Wan Shan Pumping Station was commenced and quotations for supply of pumping equipment were invited.
Water Supply to Tsz Wan Shan and Wang Tau Hom Resettlement Estates
10.51. Laying of the inlet and outlet mains for the previously constructed fresh- and salt-water service reservoirs was delayed because
78