20. Ellis Kadoorie School Extensions. This building providing six classrooms, one handwork and one domestic science room, staff rooms and additional lavatory accommodation was referred to in last year's report. The extension, which is a self-contained building separate from the existing school building, was completed in January.

21. Queen Elizabeth School, Kowloon. This school was referred to in last year's report under the heading "Kowloon Secondary School". Site formation was completed in September, and building work commenced in January.

22. Tsun Wan Primary School. Sketch plans have been prepared for what will eventually be an eighteen-classroom primary school. At present, however, it is proposed to build a school with eight classrooms—each for forty-five pupils, handwork room, domestic science room, model flat, covered playground with built-in stage, separate staff rooms for morning and afternoon sessions and living accommodation for three married staff. A separate building adjacent to the main entrance will house a school's medical clinic.

23. Working drawings for this project were commenced.

24. Extensions to Grantham Training College. Although Grantham Training College was only completed in 1952, large-scale extensions have been requested, in order to deal with the increased need for the training of teachers.

25. Sketch plans were prepared and approved, and working drawings commenced. The accommodation to be provided comprises a lecture hall to seat 320, handwork room, pottery room, music room, general lecture room, library, projects room, tutorial rooms and additional staff accommodation. The extension will be linked to the existing buildings by covered ways at each floor level and when completed will form an enclosed quadrangle about 200 feet square.