THE CHINA MAIL
THE JARDINE ENGINEERING CORPORATION, LTD.
(irgarperated under the Companies' Ordinances of Hong Kong); Phone:
Tel. Add 14, PEDDER STREET, HONG KONG. 30319.
"JARDENG"
HEAD OFFICE:-8A, Yuen Ming Yuen Road, Shanghat.
ALL KINDS OF
ELECTRICAL INSTALLATIONS
& HOUSE WIRING
CARRIED OUT ON THE
“HENLEY” WIRING SYSTEM
"
REDDAWAY'S CANVAS HOSE
INGERSOLL RAND CO., LTD.
Compressed Air Plant
and
Complete Pneumatic Plant.
for All Industries.
COMPLETE - INSTALLATIONS OF
"YORK" REFRIGERATING & ICE MAKING MACHINERY.
"MERRYWEATHER"
FIRE SERVICE INSTALLATIONS
AND
FIRE PROTECTION CURTAINS
A SPECIALITY.
HOPE'S WINDOWS.
STOCKS OF ALL KINDS OF
ENGINEERING SUPPLIES &
MACHINERY
CARRIED, INCLUDING
Chubb's Safes, Avery Scales, Steel Pulleys, Paints and
Compositions, Etc., Ele.
BUILDING SUPPLEMENT.
The site on which Gloucester Building now stands showing the driving of the Raymond, Concrete Piles. 1519 Piles ware need for the foundations of this magnificent -building;
A photograph showing 112,000 lbs. test load on one Raymond Concrete Pile.
SATURDAY, JULY
1931.
FREDK. SAGE & CO., LTD.
58-62, GRAY'S INN ROAD, LONDON, W.C.1.
SUPPLIED THE
63 SHOPFRONTS, ENTRANCE DOORS, LAYLIGHTS, GLASS FOR SHOPFRONTS, DOORS, LAYLIGHTS, AND LAMPS FOR PIERS
IN
GLOUCESTER BUILDING.
THE above illustration shows the fine Piccadilly
T
premises of Messrs. Swan & Edgar, Ltd., the Shop fronts and Interior Equipment of which were carried out by Fredk Sage & Co, Ltd.
· SPECIALISTS IN SHOPFRONTS AND EXTERIOR AND INTERIOR FITTINGS FOR EVERY TRADE,
AGENTS IN HONG KONG AND SOUTH CHINA.
HARRY WICKING & CO., HONGKONG,
RAYMOND CONCRETE
CONCRETE PILES.
A FORM FOR EVERY PILE
Were used for the Foundation of this Building.
A PILE FOR EVERY PURPOSE
TEN REASONS FOR THE SUPERIORITY
OF RAYMOND PILES OVER WOOD PILES.
1. They are permanent,
2. They are not subject to decay or to the attacks of wood
borers.
3. They are not affected by any change in water level.
4. They are economical because of double carrying
capacity.
5. Excavation work is reduced to a minimum" and form work for footings is frequently eliminated.,
Only light concrete footings are required since pile tops can be carried to ground level and piles driven at close centres, if necessary.
Total load is reduced owing to the decreased size and weight of footings.
Shoring and pumping eliminated.
9. No waste of pile due to cut-offs.
10. Every plle perfect. No brooming or shattering of
plles during driving operat
Licensees
RAYMOND
PILE
TEN REASONS FOR SUPERIORITY OF RAYMOND PILES OVER OTHER TYPES OF CONCRETE PILES.
1. They are tapered.
2. Protected with reinforced steel shells,
3. Shell excludes all water encountered during driving
operations.
4. Form in which each pile is cast may be inspected from
tip to top.
5. Obstructions displaced during driving cannot be forced
back into the concrete by back pressure.
Concrete in shell retains moisture content
can effect setting of concrete.
7. Pile top cut 100 % effective,
Piles may be Jetted without loss of cross section, then driven.
9. Speed, only a single operation by driver.
10. Spirally reinforced steel shell left in the ground, com- pletely preserves the compressive driving resistance, so that each Ramond Pile will safely sustain more than its calculated load:
THE HONG KONG EXCAVATION, PILE DRIVING & CONSTRUCTION CO., LTD.