20
113. Alterations and Additions to Non-Government Buildings:-Work was carried out in 31 buildings, the total number of points dealt with being 173.
114. Maintenance of Light Houses: -The installations in 3 light houses were maintained in good order, the number of points involved being seven.
115. Maintenance of Refrigerators and Air Condition Plant:-323 refrigerators and 40 air conditioners were maintained in good order.
116. Maintenance of Lifts:-40 lifts were maintained and kept in good order, nine ropes on five lifts were renewed.
117. Maintenance of Vehicular Ferry Piers at Jubilee Street, Jordan Road, Sham Shui Po and Mongkok:-The electrical installation of eight hoists and two vehicular ramps was maintained in good order.
118. Maintenance of Traffic and Street Signs:-25 traffic control lights and 880 tramway island beacons were maintained in good order.
119. Maintenance of Sea Wall and Piers: -Electrical installations on five Public Piers were maintained in good order.
120. Maintenance of Typhoon Masts:-15 Typhoon Masts were maintained in good repair.
Public Works Extraordinary.
121. Government Buildings:-New electrical installation at 27 Government Buildings was carried out involving 4,371 points in all.
122. Security Measures:-Special security work was carried out at 44 Police Stations and seven Waterworks installations involving 429 points in all.
Rehabilitation Loan.
123. Restoration of Damaged Government Buildings:-The electrical installations in 32 Government Buildings were replaced involving 712 points in all.
124. Replacement of Instruments and Workshops Machinery: -Electrical equipment including a frequency meter and miscellaneous workshop equipment were received.