Item.
Appendix VI (B).
31% DOLLAR LOAN
Head 8-New Markets:-
Q48
Table
LOAN
Table showing Estimated Cost of works appearing
(a) Central Market
Appendix VI (C).
ADDITIONAL WORKS TO BE CHARGED TO
A PROPOSED NEW LOAN.
Revised Estimated Cost.
$
Expenditure
up to 31.12.38.
$
EXPENDITURE
Architectural. Drainage. $ 860,126.10 580,146.63 261,313.34 1,151.65 Head 1-New Markets:- (a) Central Market 50,000.00 Head 2-Water Works:- (a) Supply to Albany (b) 100,000.00 80,541.18 Peak Road 130,000.00 53,181.40 19 (c) Cross Harbour Pipes 900,000.00 581,801.12 (d) Rapid Gravity Filters, Eastern 490,000.00 9,442.72 (e) Kowloon Chai Service Reservoir 240,000.00 22,780.80 (f) Supply Main to Kowloon Chai Service Reservoir 250,000.00 1,854.95 (g) Distribution Island 19,247.25 210,000.00 (h) Mainland 44,588.25 (i) Shing Mun Valley Scheme Catchwater 1,070,000.00 253,895.39 (1) Rapid Gravity Filters, Shing Mun Valley Scheme 150,000.00 (k) Tai Lam Chung Scheme, Preliminary Works 70,000.00 10,000.00 (1) New Meters 210,000.00 (m) Waste Detection Equipment 300,000.00 (n) Reconstruction at Albany (0) Miscellaneous Works 106,500.00 Head 3-Miscellaneous Works:- (a) Extension of Aerodrome, Preliminary Works 60,000.00 TOTAL LOAN WORKS 38,121.91 299,435.25 1,151.65