87
The extension to Sun Wai Camp area was set out and centre lines of various roads in the New Territories.
25. The frontage lines to streets of 335 lots were checked.
26. 3,592 stones were fixed to define the boundaries of 917 lots.
27. Boundaries of numerous lots and street alignments were set out for the Drainage, General Works and Roads sub-departments.
SURVEY OF COLONY.
28. The following tabulated statement shows the work done under this heading:
Area surveyed Area plotted Chainage in acres: in acres. in feet. City of Victoria 20.16 19.27 35,191 North Point.. 3.95 3.33 6,143 Stanley .93 .93 2,515 Repulse Bay .85 .85 1,400 Tytam Gap 3.89 3.89 17,020 Tai Hang .09 .09 1,040 Wong Nei Cheong 2.30 2.24 2,380 Shek O 5.63 5.63 13,968 Wong Nei Cheong Gap 1.01 1.01 1,700 Shaukiwan 6.07 6.07 4,474 Kai Lung Wan 10.00 10.00 Aberdeen Waterworks 2.04 2.04 8,228 Mount Cameron.. 1.70 1.32 2,447 Kowloon 117.00 117.00 49,400 New Kowloon... 414.00 414.00 313,193 Revision work was also carried out as follows: City of Victoria 6.82 6.82 16,177 Repulse Bay 2.38 2.32 4,332 Shek O 8.26 8.26 2,200 Stanley .44 .44 946 New Kowloon 57.00 57.00 21,100The surveys mentioned in paragraph No. 22 were also plotted on the Colony Sheets.