59
(xii.) Extension of 6" sewer to intercept drainage from houses on R.B.L. 34, Peak, (completed),
(xiii.) Diversion of Glenealy storm-water culvert at junction of Wyndham Street and Albert Road, (completed) :
Cost of work, $520.41
of I.L. 1280, -$1,012.62
- 425.33
Less contribution by Lessees 587.29
(xiv.) Extension of 6" sewer to University Hostel, Bonham Road, I.L. 1877, (completed), 403.26
(xv.) Extension of storm-water outfall on Praya East opposite Tai Wo Street, (completed), 308.83
(xvi.) Extension of 9" storm-water drain in Po Hing Fong to I.L. 700 (completed), 244.53
(xvii.) Extension of 6" sewer to I.L. 1909, Stone Nullah Lane, (completed), 274.54
(xviii.) Extension of 6" sewer to I.L.'s 266, 267 and 268, Beach Street, (completed), 250.21
(xix.) Extension of 6" sewer to S.L.L. 407, Shaukiwan West, (completed), 230.94
- 312.00
— 200.92
169.86
(xx.) Re-laying old storm-water drain with 6" pipes between Nos. 52 and 72A, Queen's Road Central, (completed),
K
(xxi.) Extension of 6" sewer to I.L. 797, Water Street, (completed),
(xxii.) Extension of 6" sewer to L.L. 1897, Breezy Path, (completed),
(xxiii.) Extension of 9" sewer in Cooper Street, Tai Hang, between Shepherd Street and branch nullah, (completed),
(xxiv.) Construction of catchwater channel on south and west sides of Tai Hang Village, (completed),
-
(xxv.) Extension of 6" sewer in Hau Fung Lane to I.L. 1913, (completed):-
Cost of work, -$185.91
Less contribution by Lessee, 200.00
Credit, 14.09
(xxvi.) Diversion of storm-water channel in rear of I.L. 1897, Breezy Path, (completed) :—
Cost of work, 222.51
Less contribution by Lessee, 222.51
152.99
134.14