D 38
CAP. 358
[Subsidiary]
D3.
Water Pollution Control (General) Regulations
[1988 Ed.
APPLICANT
MANAGER OF INDUSTRIAL ENTERPRISE (If not the applicant)
Signature/s
Name/s
(Block letters)
Date
The fee prescribed in the Third Schedule to the Water Pollution Control (General) Regulations should accompany this application.
SECTION E. LOCATION OF PROPOSED INDUSTRIAL PREMISES, OF PROPOSED DISCHARGE POINT AND OF PROPOSED SAMPLING POINT
E1.
E2.
Draw in the space provided, or on a separate sheet, a sketch plan, as nearly as possible to scale, showing the location of the proposed industrial premises or of the building in which they will be situated (if premises will be part of a larger building). On the plan-
(a) show the relationship of the premises or building to the nearest major road intersection, and name the roads; or show the relationship of the premises or building to a readily identifiable landmark;
(b) show any public drain, public sewer or waters of Hong Kong adjacent to the premises or building; and
(c) mark the location of every proposed discharge point.
Draw in the space provided, or on a separate sheet, a second sketch plan, as nearly as possible to scale, showing the layout of the proposed industrial premises. On the plan-
(a) show the location of any proposed on-site treatment plant;
(b) mark the location of every proposed sampling point.
香港政府
表格4
水污染管制條例
(香港法例第358章)
致
第19條第(1)款
工業樓宇污水排出或在外間積聚廢料牌照申請書
.管制區水污染管制監督: