1989 Ed.]
Tramway
Section
1.
Short title
2.
Interpretation
CHAPTER 107
TRAMWAY ORDINANCE
[CAP. 107
1
ARRANGEMENT OF SECTIONS
Page
CONSTRUCTION OF TRAMWAY
3.
4.
Construction and route of tramway
Power to lay single line where double line authorized, and to reconvert into
double line
5
6
5.
Power to widen bridges, etc.
6.
Attachment
6
7.
Electricity
7
8.
Power to lay down sea water pipes
7
9.
Gauge of tramway
7
10.
Power to break up roads
8
11.
Completion of works, and restoration of road
8
12.
Further provisions as to construction of tramway
9
13.
Repair of roads on which tramway laid
14.
Maintenance and level of rails
15.
Alteration of track
9
16.
Payment for works
10
17.
Temporary tramways may be made when necessary
11
18.
Application of road materials excavated in construction of works
12
19.
Protection of departments and persons
12
20.
Protection of sewers, etc.
14
21.
Protection of Government or telegraph cables or lines
15
22.
Rights of departments, etc., to open roads
15
23.
Differences between company and others (other than the Director).
16
24.
Differences between company and Director
16
25.
Tramway not to be opened until certified fit for traffic
17
INSUFFICIENT USER OF TRAMWAY
26.
Procedure when public not afforded full benefit of tramway
17
27.
Procedure on non-compliance with order
18
1