1989 Ed.]

Noise Control (General) Regulations

[CAP. 400

A 17

FORM 4

NOISE CONTROL ORDINANCE

(Chapter 400)

Section 8(9)

CONSTRUCTION NOISE PERMIT FOR THE

CARRYING OUT OF PERCUSSIVE PILING

CONSTRUCTION NOISE PERMIT NO.

To:

[Subsidiary]

[reg. 5(b)]

This construction noise permit is issued in accordance with section 8 of the Noise Control Ordinance. Permission is granted for the carrying out of percussive piling, subject to the conditions set out below. The carrying out of percussive piling otherwise than in accordance with the conditions may result in the permit being cancelled and in a prosecution for an offence.

CONDITIONS

Construction site where percussive piling may be carried out:

1.

Full street address:

2.

Lot No.:

The piling zone, that is, the area within which percussive piling may take place is delineated on the attached plan which forms part of this construction noise permit.

Percussive piling method and pile type which may be used in the piling zone:

Piling method and pile type

No. of units

Share This Page