1989 Ed.]

Noise Control (General) Regulations

[CAP. 400

A 5

[Subsidiary]

4. Detailed information regarding the application

4a. Details of any previous application for the use of powered mechanical equipment for the purpose of carrying out construction work other than percussive piling in relation to the same site:

Indicate by ticking in the appropriate box whether:

No previous application has been made.

If previous application has been made, indicate whether:

The application was refused.

OR

A permit was issued.

Construction noise permit No.:

Date of expiry:

4b. Duration for which the construction noise permit is required:

Duration:

Dates: From

To

(Specify days/weeks/months)

(inclusive)

4c. Indicate by ticking in the appropriate box the time period for which the construction noise permit is required:

General holiday including Sundays

07.00-19.00 hr. []

19.00-21.00 hr.

Any day not being a general holiday

21.00-23.00 hr.

23.00-07.00 hr. on next day

19.00-21.00 hr.

21.00-23.00 hr.

23.00-07.00 hr. on next day

OR State particular times between which construction noise permit is required:

4d. Powered mechanical equipment for which the construction noise permit is required. Reference should be made to Table 3-Source Sound Power Levels for Items of Powered Mechanical Equipment, contained in the Technical Memorandum on Noise from Construction Work other than Percussive Piling, if applicable.

Identification code of item of powered mechanical equipment (if applicable)

Description of item of powered mechanical equipment

No. of units