G 30

CAP. 281]

Merchant Shipping (Fees) Regulations

[1989 Ed.

[Subsidiary]

SECTION L-SHIPS CARRYING GRAIN CARGOES

Purpose or service

The following fees shall be payable--

1989/90 $

Fees

1990 $

1. For the examination of a plan of loading for grain cargoes

2,270

2,730

2. For examining and certifying a copy of a plan of loading subsequent to the examination of the original plan

650

780

3. For an alteration in a plan of loading not affecting the original calculation

a fee determined by the time involved, charged at the hourly rate.

a fee determined by the time involved, charged at the hourly rate.

4. For the inspection on a ship of any alteration in the arrangement of fittings for the carriage of grain cargoes necessitating an alteration in the plan of loading.

a fee determined by the time involved, charged at the hourly rate.

a fee determined by the time involved, charged at the hourly rate.

5. For the inspection on a ship of grain fittings-

(a) for one visit for one compartment

(b) for each additional compartment at the same visit

SECTION M-CREW ACCOMMODATION

Note: In this Section "sister ship" means a ship-

(a) the crew accommodation of which in respect of the overall size, location and disposition thereof and the arrangements for heating, lighting, ventilation, water services, deck sheathings and insulations corresponds with another ship which has already been inspected or which will have been inspected prior to the inspection of that ship; and

(b) as to which, prior to the inspection, application is made in writing by or on behalf of the owner for that ship to be treated as a sister ship, accompanied by declaration that it complies with the foregoing requirements.

Purpose or service

1989/90 $

Fees

1990 $

The following fees shall be payable---

1. For the inspection of crew accommodation on first registry or re-registry in a ship not being a sister ship-

not exceeding 50 tons

exceeding 50 tons but not exceeding 100 tons

exceeding 100 tons but not exceeding 500 tons

exceeding 500 tons but not exceeding 2,000 tons

5,400

6,480 plus $1,950 for each 50 tons or part thereof exceeding 100 tons.

22,040 plus $1,170 for each 100 tons or part thereof exceeding 500 tons.

6,480

7,780 plus $2,340 for each 50 tons or part thereof exceeding 100 tons.

26,450 plus $1,410 for each 100 tons or part thereof exceeding 500 tons.

Page 30

Page 31

Share This Page