G 20

CAP. 281] Merchant Shipping (Fees) Regulations

[1989 Ed.

[Subsidiary]

Purpose or service

(d) 10 000 tons or over but under 15 000 tons ...

Fees

1989/90 1990

$ $

113,760 136,520

136,260 163,520

(e) 15 000 tons or over

Note: The fees prescribed in this item include examination and approval of plans relating to the arrangement of safety equipment.

2. For the survey of a ship for the renewal of a safety equipment certificate or a qualified safety equipment certificate together with an exemption certificate, in the case of a ship of (a) 500 tons or over but under 1 600 tons

(b) 1600 tons or over but under 3 000 tons

(c) 3 000 tons or over but under 10 000 tons....

(d) 10 000 tons or over but under 15 000 tons ...

(e) 15 000 tons or over

3. For survey and issue in duplicate of a safety equipment certificate for a period of validity of less than 24 months

4. For a partial inspection of the safety equipment of a ship required to hold a safety equipment certificate-

(a) made on the application of the owner; or (b) made otherwise than on the application of the owner, where equipment is found defective: For each visit made by a surveyor to the ship Maximum fee

5. For the survey of a ship for the issue of a safety equipment certificate granted exceptionally to cover a period not exceeding 3 months beyond the expiration date of an existing certificate

6. For the initial inspection of the safety equipment of a ship not required to hold safety equipment certificates and for the issue of a report on Form Surveys 183/183A on the application of the owner, in the case of a ship

7,130 plus $3,680 for each visit after the second. 10,590 plus $3,680 for each visit after the second. 14,260 plus $3,680 for each visit after the second. 15,770 plus $3,680 for each visit after the second. 17,280 plus $3,680 for each visit after the second.

8,560 plus $4,420 for each visit after the second. 12,710 plus $4,420 for each visit after the second. 17,120 plus $4,420 for each visit after the second. 18,930 plus $4,420 for each visit after the second. 20,740 plus $4,420 for each visit after the second.

1/24 of the appropriate fee in item 2 of this Section for each month or part of a month but not less than 1/2 of the appropriate fee in item 2 of this Section.

1,950 2,340

the appropriate fee in item 2 of this Section.

1/4 of the appropriate fee in item 2 of this Section.

(a) under 50 tons

5,730 6,880

(b) 50 tons or over but under 150 tons

8,210 9,860

(c) 150 tons or over but under 300 tons (d) 300 tons or over but under 500 tons

11,370 13,650

13,640 16,370

Page 20

Page 21

Share This Page