G 10

CAP. 281]

Merchant Shipping (Fees) Regulations

[1989 Ed.

[Subsidiary]

(3) In any case in which the duration of the certificate has been limited by the surveyor's declaration, owing to special reasons rendering one or more further surveys necessary within the ensuing 12 months, the total fees payable under items 2, 3, 4, 5(a), (b), (c) and (d) inclusive of this Section for certificates covering the period of 12 consecutive months shall not exceed that payable for a 12 months' certificate.

Purpose or service

Fees

1989/90 $

1990 $

The following fees shall be payable for surveys and shall include the issue in duplicate of the appropriate certificate-

1. For the initial survey of a ship for the issue of a passenger certificate, safety certificate or passenger certificate combined with a safety certificate

2. For the survey of a ship for the renewal of a passenger certificate, safety certificate or passenger certificate combined with a safety certificate, in the case of a ship-

a fee determined by the time involved, charged at the hourly rate.

(a) not exceeding 500 tons

14,040

16,850

(b) exceeding 500 tons but not exceeding 1,000 tons

23,330

28,000

(c) exceeding 1,000 tons but not exceeding 1,500 tons

35,000

42,000

(d) exceeding 1,500 tons but not exceeding 5,000 tons

(e) exceeding 5,000 tons but not exceeding 10,000 tons

(f) exceeding 10,000 tons but not exceeding 15,000 tons

(g) exceeding 15,000 tons but not exceeding 20,000 tons

(h) exceeding 20,000 tons but not exceeding 30,000 tons

40,400 plus $4,320 for each 500 tons or part thereof by which the ship exceeds 1,500 tons.

70,640 plus $3,140 for each 500 tons or part thereof by which the ship exceeds 5,000 tons.

101,960 plus $5,940 for each 1,000 tons or part thereof by which the ship exceeds 10,000 tons.

131,660 plus $5,940 for each 1,000 tons or part thereof by which the ship exceeds 15,000 tons.

161,360 plus $2,960 for each 1,000 tons or part thereof by which the ship exceeds 20,000 tons.

48,480 plus $5,190 for each 500 tons or part thereof by which the ship exceeds 1,500 tons.

84,770 plus $3,770 for each 500 tons or part thereof by which the ship exceeds 5,000 tons.

122,360 plus $7,130 for each 1,000 tons or part thereof by which the ship exceeds 10,000 tons.

158,000 plus $7,130 for each 1,000 tons or part thereof by which the ship exceeds 15,000 tons.

193,640 plus $3,560 for each 1,000 tons or part thereof by which the ship exceeds 20,000 tons.

-

Page 10

Page 11

Share This Page