[Subsidiary]

CAP. 123]

Building (Administration) Regulations

[1985 Ed.

(a) Estimated time for which the shed is required.

(b) Description of intended use.

(c) If intended for habitation state number of persons to be accommodated.

(d) Details of construction, latrine water-closet, and kitchen accommodation.

No. of Registration Certificate

Permit No. B.O.O. Ref. No.

To:

Signature of registered contractor.

Address.

GOVERNMENT OF HONG KONG

FORM 34

BUILDING (PLANNING) REGULATIONS

Regulation 53

Permit to erect a contractor's shed

Office of the Building Authority.

19

I hereby permit the erection of a contractor's shed at (No. and name of street) (Lot No. Area No.) on the plan submitted, in the position indicated.

2. This permit is issued subject to the following conditions-

(a) the size of the shed is to be

(b) the work shall be carried out in accordance with the provisions of Part VII of the Building (Planning) Regulations:

(c) all precautions against fire shall be taken to the satisfaction of the Director of Fire Services;

(d) the maximum number of persons to be accommodated shall be

(e) this permit shall be handed to the person in charge of the work;

(f) this permit may be cancelled at any time without compensation by the service of a notice in writing on the permittee by the Building Authority, and

(g) upon expiry or cancellation of this permit, the contractor's shed shall be removed forthwith.

3. This permit is valid until

pro. Building Authority.

Page 50

Page 51

Share This Page