1985 Ed.] Building (Administration) Regulations
GOVERNMENT OF HONG KONG
FORM 21
BUILDING (ADMINISTRATION) REGULATIONS
Regulations 25 and 26
Certificate on completion of building works not resulting in
a new building or of street works
[CAP. 123
A 41
19
To the Building Authority.
In accordance with the provisions of regulation 25 and 26 of the Building (Administration) Regulations, I/we
registered contractor, of (address)
certify that the
works (here state whether building works or street
works) carried out at (No. and name of street)
on (Lot No./Permit Area No.)
you gave your consent on
B.O.O. Ref. No.
to the carrying out of which
19
Permit No. have been carried out in
accordance with the provisions of the Buildings Ordinance and regulations made thereunder.
No. of registration certificate
Signature of registered contractor.
19
In accordance with the provisions of regulation 25 of the Building (Administration) Regulations, I
registered structural engineer of
(Address)
certify that the structural elements of the above building have been erected in accordance with the plans approved by you and are, in my opinion, structurally safe (B.O.O. Ref. No. ...).
Signature of registered structural engineer.
[Subsidiary]
L.N. 188/74.
In accordance with the provisions of regulation 25 and 26 of the Building (Administration) Regulations, I authorized person, of (address)
certify that the above
L.N. 10/75.
works have been
G.N.A. 103/59.
carried out in accordance with the plans approved by you and are, in my opinion, structurally safe (B.O.O. Ref. No. ...).
2. Total cost of the building works $
Signature of authorized person.
19