5.

1987 Ed.]

Air Pollution Control (Specified

[CAP. 311

F9

Processes) Regulations

[Subsidiary]

Mode of Operation (Continuous/Batch)

Installed/Processing* Capacity

Silo Capacity

(for Cement Works Only)

Total No. of Emission Points

Mode of Discharge to Atmosphere

Exhaust

Emission

Cases

Point No. Flowrate

(m3/h)

Exit

Temperature

(°C)

Fugitive

Emission

(Yes/No)

Discharge

or Chimney

Height

(m)

If NOT discharged upward freely, please specify

Cross-section of Discharge Exit or Chimney

Highest Building/

Structure within

100m of the Premises

Width

Length Diameter Distance

Height

(m)

(m)

(m)

(m)

(m)

Classification of Specified Process under Application

Nature of Work

Noxious or Offensive Emissions

* Delete if not applicable.

Share This Page