201

Appendix IV.

WASTE DETECTION.

Estimated capital outlay necessary to equip Hong Kong and Kowloon for

systematic waste detection work :

Alterations to distribution systems

Provision of meters

Alterations to private house services

e

120,000

120,000

60,000

$

300,000

Annual operating expenses are estimated as follows:-

I European Inspector, including housing, travelling, transport and

pension @ say £500 per annum

8,000

10 Asiatic Inspectors, including housing, travelling, transport and

pension @ say $1,000 each

10,000

Fitters and coolies

7,000

Maintenance of meters and equipment

Road openings and reinstatement

5,000

10,000

Estimated ultimate saving in consumption-say 7%.

On present maximum consumption say 2 M.G.P.D.

Estimated capital outlay represented by 2 M.G.P.D. $3.500,000.

Loan Charges on $3,500,000.

Interest and Sinking Fund-7%

Deduct.

40,000

262,500

7% on $300,000

$ 22,500

Annual charges-salaries and maintenance

40,000

62,500

Estimated ultimate saving p.a.

200,000

NOTE.

An effective waste detection system will take a few years to perfect and during that period the average annual saving would be very considerably less than $200,000.

Share This Page