FINAL REPORT.

PRAYA EAST RECLAMATION SCHEME.

Hon D.P.W.,

The construction of the above Scheme is now completed except the works included in the Reconstruction of Buildings, Boundary Walls, &c., rendered neces- sary by the Exchange of land at R.N. Arsenal Yard, together with a small amount of surfacing to the new roadways. The new sites for the reconstruction of the Arsen- al Yard Buildings and Boundary Walls have not been selected, it is not possible therefore to put this work in hand. Agreement however has been reached with the Naval Authorities as to the cost of carrying out this work. The surfacing of road- ways is being carried out under Contract and is now nearing completion, thus enabling the cost of the uncompleted work to be ascertained definitely.

lows:--

The principal works carried out and comprised in the Scheme are as fol

(a) The construction of 4,995 lineal feet of sea wall founded on pell-mell rubble foundations deposited in trenches dredged to depths ranging between 21 feet and 31 feet below Ordnance Datum.

(b) The construction of 193 lineal feet of Quay Wall in sloping blockwork on the seaward limit of the old Naval Camber and at the Western extremity of the sea wall. The depth of water alongside the Quay Wall is 16 feet 10 inches at low water. The Quay Wall is connected to Admiralty wharfage by the construction of a reinforced concrete wharf 23 feet in length. The Quay Wall and wharf were handed over to the Naval Authorities on completion of construction.

(c) The construction of two public piers in reinforced concrete, one of these piers is situated at the end of Fenwick Road, and is built T shaped, it projects a distance of 41 feet 4 inches from the sea wall cope and provides at its outer face a berth of similar length; the other pier is 120 feet 8 inches long and 35 feet 4 inches wide with four flights of landing steps and situated at the end of Tonnochy Road.

(d) A Refuse Boat Pier projecting 58 feet from the Cope at the end of Fleming Road. This pier is constructed in sloping blockwork and provides 60 feet of berthage on its outer face having a depth of 15 feet of water below Ordnance Datum.

(e) The filling in of the reclamation area, Naval Camber and Bowrington Canal, requiring 3,111,099 cube yards of filling material. This ma- terial was obtained from Morrison Hill, East Point Hill and other sources such as the spoil from works under construction.

+

(f) The construction of the following lengths of sewers on the Reclama-

tion Area :-

27 inches diameter

600.5 lineal feet.

21

>>

>>

12

3,790.4 1,106

22

22

وو

9

>>

6

CO

''

2,215 ..14,527