50
the Director of Public Works. The areas coloured green and yellow to be handed over to Government free of cost on completion. The whole of the reclamation work to be completed within 7 years of the date mentioned in (b).
(f) The Promoters must, before disposing of any of the land within the re- clamation area, submit, for the approval of the Director of Public Works, a plan showing at least one cross street sub-dividing the central group of lots from north to south and similarly at least one cross street sub-dividing each of the groups of lots situated to the eastward of the said central group. Such cross streets may not be of a less with than 50 feet in each case. Such plan shall further show an area of at least 4 acres in a position to be approved by Government which shall be set aside for purposes of recreation. Power is reserved to the Director of Public Works to require such modifications as he may think fit and to specify the size and positions of all storm-water drains, gullies and manholes as well as the size and positions of all sewers and their out- falls. No alterations from the plan, when once it has been approved, will be permitted unless with the written authority of the Director of Public Works. The streets shown on the said plan and the cross streets specified above when filled in to the satisfaction of the Director of Public Works shall be taken over by Government as public streets, free of cost. Power is further reserved to Government to take over as public streets or lanes, free of cost, any additional streets or lanes laid out within the reclamation area.
(g.) The Promoters shall construct at their own cost the whole of the principal storm-water nullahs shown on the plan attached, and in addition all such other nullahs, drains and other works for the discharge of storm-water as the Director of Public Works may consider necessary both for the actual reclamation area, and for carrying off all waters whose passage has been obstructed by the reclamation, and all such works shall be in size, design, construction and all other respects to the entire satisfaction of the Director of Public Works.
(h.) The Government to construct and lay at its own expense all sewers required in the roads coloured green on plan attached and in all other streets which the Government may hereafter decide to take over as public streets. The outfalls of all such sewers shall be constructed during the building of the sea wall. Such outfalls shall be built to the design, requirements and entire satisfaction of the Director of Public Works by the Promoters and at their own cost. Any other sewers required shall be laid by Government at the expense of the Promoters. (j.) The Government to surface, kerb and channel at its own cost the roads coloured green on plan attached, generally as developments proceed on the various lots. The Director of Public Works shall however have power to decide to what extent such surfacing, kerbing and channelling is to be carried out.
(k.) The Government to surface, kerb and channel all streets formed within the boundaries of the reclamation area. In the case of the streets coloured green, the cross streets specified above and such other streets as may be taken over by the Government the surfacing, kerbing and channelling shall be carried out at Government expense. In the case of all other streets the cost shall be borne by the Promoters.
(1) The Crown Lease shall contain a proviso that the Promoters or their Assignees shall have no claim to any access to the sea nor to any com- pensation in the event of any reclamation being made on the seaward side of the lot and a clause reserving to the Government the power to reclaim the foreshore at any time and without consulting the Promoters or their Assignees. The Government shall however undertake not to allow any noisome or obnoxious trade to be carried on on any part of a future reclamation or extension in front of the proposed reclamation area. (m.) Permission shall be granted to the Promoters to obtain earth from Crown land at points to be approved by the Director of Public Works for the purpose mentioned in (e). The Promoters shall also be required to