HONGKONG.

DIAGRAM OF THE MONG-KOK-TSUI BREAKWATER SHEWING PROGRESS

OF STONE DEPOSITING TO 31ST DECEMBER, 1912.

Laid before the Legislative Council by Command of His Excellency the Governor, February 13th, 1913.

OUTER SIDE

ORDINARY

INNER SIDE

OUTER SIDE

3,285 feet measured on centre line

PLAN OF BREAKWATER

44′3′′

No. 1013

2

INNER SIDE

SPRING TIDES

- 3-

AVERAGE HEIGHT OF STONE DEPOSITED TO 31st DEC., 1912.

MUD LEVEL

AVERAGE LEVEL OF BOTTOM

DREDGEE, TRENCH

192'

INNER SIDE

OUTER SIDE

SPRING TIDES

HIGH WATER ORDINARY

1912.

W. CHATHAM, Director of Public Works.

ON OF THE BREAKWATER SHEWING STONE DEPOSITED ¦ AVERAGE CROSS SECTION OF THE BREAKWATER SHEWING STONE DEPOSITED HE LENGTHS CROSS-HATCHED ON PLAN ABOVE. TO 31-12-12 FOR THE REMAINING LENGTHS ON PLAN ABOVE.

FRAGE HEIGHT OF STONE DEPOSITED

BOTTOM

OF

DREDGED TRENCH

192'

SCALE FOR PLAN 1 INCH-400 FEET. SCALE FOR SECTIONS 1 INCH-40 FEET.