HONGKONG.
DIAGRAM OF THE MONG-KOK-TSUI BREAKWATER SHEWING PROGRESS
OF STONE DEPOSITING TO 31ST DECEMBER, 1912.
Laid before the Legislative Council by Command of His Excellency the Governor, February 13th, 1913.
OUTER SIDE
ORDINARY
INNER SIDE
OUTER SIDE
3,285 feet measured on centre line
PLAN OF BREAKWATER
44′3′′
No. 1013
2
INNER SIDE
SPRING TIDES
- 3-
AVERAGE HEIGHT OF STONE DEPOSITED TO 31st DEC., 1912.
MUD LEVEL
AVERAGE LEVEL OF BOTTOM
DREDGEE, TRENCH
192'
INNER SIDE
OUTER SIDE
SPRING TIDES
HIGH WATER ORDINARY
1912.
W. CHATHAM, Director of Public Works.
ON OF THE BREAKWATER SHEWING STONE DEPOSITED ¦ AVERAGE CROSS SECTION OF THE BREAKWATER SHEWING STONE DEPOSITED HE LENGTHS CROSS-HATCHED ON PLAN ABOVE. TO 31-12-12 FOR THE REMAINING LENGTHS ON PLAN ABOVE.
FRAGE HEIGHT OF STONE DEPOSITED
BOTTOM
OF
DREDGED TRENCH
192'
SCALE FOR PLAN 1 INCH-400 FEET. SCALE FOR SECTIONS 1 INCH-40 FEET.