HONGKONG.

Laid before the Legislative Council by Command of His Excellency the Governor, August 31st, 1911.

TIDES

HIGH

WATER

ORDINARY SPRING

TIDES

LOW WATER ORDINARY SPRING

MUD LEVEL

MONG- KOK-TSUI BREAKWATER

AVERAGE

AVERAGE

HEIGHT OF

LEVEL

STONE

OF BOTTOM

12A

No. 1911

HIGH

WATER

ORDINARY

SPRING

TIDES

30TH

LOW WATER ORDINARY SPRING

TIDES

JUNE 1911

OF DREDGED BENCH

DEPOSITED

MUD LEVEL

PROGRESS OF STONE

DEPOSITING

TO 30 TH JUNE 1911

192

20 FEET

IINCH

PT JO

6

10

20

30

40

30

60

70

80

90

100 FT

DIAGRAM

SHOWING

SCALE

Total Area of Average Cross

Section of Breakwater shewn above = 4,790 Sq. Ft.

Stone Deposited to 30th June 1911 shewn thus:-

Area of Stone Deposited to 30th June 1911-.. Proportion of Stone Area to. Total Area of

=

681

Cross Section =

14%

Athith you 21.8:11.

Share This Page