185 (70)
Appendix No. 8.
Enclosure "A".
Estimate and Bill of Quantities of a typical three storied Chinese House without
balcony under the Old Ordinance and the New Ordinance.
Old Ordinance.
New Ordinance.
C.
Old Ordinance.
C.
New Ordinance.
(2.
46
59 Yards.
Cube Excavation,
18
$ 8.28
30 $ 17.70
07.
12
13
Cube Lime Concrete,
1.50
18.00
.2.50
$2.50
"
a.
15
21
>>
Cube Stone footings, ...........
3.00
45.00
4.50
94.50
19
Sup. Damp Proof course,.
Nil.
Nil.
80
15.20
51
+5
Sup. 6 inches Lime Concrete floors,
36
18.36.
54
27.54
اة
51
Sup. Canton Tiles on floors,
54
27.54
72
36.72
22
22
51
Sup. 6 inches lime and 2 inch cement con-
crete to kitchen and yard,
81
17.82
1.26
27.72
2335
b.
1950
5313 Feet.
b.
3215
Cube Red Brickwork in cement mortar, Cube Blue
15
292.50
25
1328.25
12
385.80
Nil.
77
b.
103
590
"
Cube Red Brickwork in cement,
30
30,90
40.
236,00
C.
42
54
5
5 Yards.
1 No.
Cube stone in jambs and steps, Lineal 4 inches earthenware drain, Gulley Trap,
43
18.06 1.20
64.80
1.60
8.00
1.60
8.00
3.50
3.50 3.50
3.50
d.
238
197 Yards. Sup. Stucco to walls,
10
23.80
25
49.25
615
615
Sup. lime brushing internal walls,
04
24.60
10
61.50
594
594 Feet.
Sup. Roof tiling,
.07
41.58
15
89.10
e.
99
81 No.
China fire Poles 14 feet,
70
66.30 1.20
97.20
e.
12
China fire Poles 7 feet,
&.
25
20 Feet.
Cube Hardwood wall plate,
950
950
Sup. China fir flooring,
e. 380
Sup. China fir rough flooring covered with
Canton Tiles,
1928 2
40
4.80
75
18.75
1.20
24.00
06
57.00
12
114.00
10
38.00
Nil.
f.
198 Feet. Sup. of Cement Concrete floors and ceutering,
Nil.
27
53.46
286
**
Lin. 12" x 1" Cement skirting,
Nil.
10
28.60
g.
27
10
Cube Hardwood lintels,
75
20.15
1.20
12.00
15
k.
1,610
lbs.
Weight steel Hardwood lintels,
Nil.
05
80.50
j.
4
2
No.
Large Windows,
10.00
40.00 60.00
120.00
Small Windows,..
7.00
42.00 18.00
108.00
"
1
1
Front door,
10.00
36.00
2
14
Hardwood Staircases,.
14 yards. Liul. waste pipe and connections,
12.00
24.00 35,00
70.00
45
10.30
80
11.20
5
"
Linl. cast iron eaves gutter,
Nil.
1.00
5.00
14
5+
Liul. cast iron R. W. pipe,
Nil.
80
11.20
2
*
Linl. C. I. footpath Channel,
Nil.
1.00
2.00
B
3 No.
Fireplaces: Old of wood and tiles, New
*
of Brick and cement,.
2.50
7.50
5.00
15.00
3
3
Hoods: Old of plaster, New of iron,.
9.00 5.00
15.00
77
105 Yards.
Sup. painting,
07
5.39
11
11.55
Total,
$1,316.93
$2,906.99
Old, Say $1,300. New, Say $2,900.
a. These items increased in New owing to additional thicknesses of walls.
b. Total brickwork in old 5,268 and in New 6,103 Cube feet. The increase of New over old would be
much greater but for the increased size of windows in New.
c. This item increased in new owing to additional thickness of walls.
d. This item less in New owing to the increased size of window openings.
e. This item less in New owing to upper Kitchen floors now being made of concrete, sce item f.
g. This item less in New owing to large front windows requiring steel lintels, see item h.
j. New front windows are 3 to 4 times the size of old front windows.
Page 330Page 331