Diary of work performed by the Electricians of the H.K.V.E. during Camp, 1905.

SUBJECTS.

7.00 p.m. Tracing connection on switchboard.

TIME.

DATE.

From

To

1905.

14th Oct.,

6.00 p.m.

15th

6.00

7.00

»

""

16th.

17th

5.30

6.30

37

27

כן

17th

5.30 p.m.

7.00

17th

8.00

9.30

J'

25

Dynamo attendance.

Incandescent lighting of Defence buildings.

REMARKS.

10.00 a.m. 11.30 a.m. | Tracing E. L. connectious, preparing and fitting | The Camp was il-

7.30 a.m.

11.30

5+

6.00 p.m.

brushes to dynamos.

Fixing up projectors for working outside No. 19

Emplacement.

Working temporary projector as searchlight, and at

same time Camp lights, all from 19 dynamo, No. 20 engine being out of action. Lecture-Construction of dynamo.

Working Nos. 19 and 20 dynamos.

Installing tents with incandescent lamps.

Lecture-E. L. instruments and tools.

luminated from Nos. 19 and 20 Engine Room during the whole period, by the Volunteers, equi- valent of 150 16- c.p. lamps were installed.

18th

6.00 a.m.

39

18th

8.00

.9.30

D

19th

10.00

"+

19th

20th

"

4.45 p.m.

10.00 a.m.

12 Non.

Fitting tents with incandescent lights.

20th

>>

21st

5.30 p.m.

6.00 a.m.

6.30 p.m.

7.30 a.m.

21st

10.00

11.45

37

17

""

Working Nos. 12, 13 and 14 lights.

Working Nos. 19 and 20 lights from No. 20 dynamo.

Tracing cross faults in No. 19 cirenits.

22nd

10.00

11.30

Lecture Obms laws to E.L. work,

15

"

97

23rd

6.00

7.30

Lecture Arc carbons, reflectors.

"

"1

93

24th

i 6.00

7.30

17

24th

"7

6.30 p.m.

25th

7.00 a.m.

"

25th

10.00

""

25th

37

5.30 p.m.

26th

6.00 a.m.

"7

26th

10.00

""

26th

5.30 p.m.

7.00 p.m.

27th

7.00 a.m.

לל

27th

10.00

""

27th

J

28th

"

28th

"

2.30 p.m.

31st

73

9.00 pm.

8.00 a.m.

12 Noon.

7.00 p.m.

8.00 a.m.

12 Noon.

1

Lecture Reflectors, lenses.

Mauning Nos. 12, 13, 14, 19 and 20 lights.

Lecture--Beans, focussing, fixing, and directing.

Finding polarity of dynamos, in changing carbons.

Dismantling and re-fixing a mark III projector.

Visit to and explanation of a service Directing Station

and Telephone Room, R.E. Communications. Connecting up and working No. 19 temporary pro-

jector.

Working Nos. 12, 13, 19 and 20 lights,

8.00 a.m. Lecture-Arc Carbons.

12 Noon. Adjustments and working of automatic lamps.

7.00 p.m.

5.30 p.m.

6.00 a.m. 7.30 a.m.

5.30 p.m.

0.00 a.m. 10.00 a.m.

Working Nos. 12, 13 and 20 lights.

Lecture Automatic lamps, lenses, and reflectors.

Technical Inspection by O.C. Submarine Mining.

Dismantling incandescent fitting in lamps.