Works Undertaken for Outside Parties

79. (a)

(b)

(c)

(a)

(e)

In March 1978 the fixed barriers in the southern concourse of Kowloon Station were modified to removable to facilitate the exhibition organised by the British Trade Commission.

A 4-way undertrack cable duct was laid at Mile 9% (14.8 m.) in February 1978 for the Hong Kong Telephone Company

A 2-way undertrack gas pipe was laid in December 1977 at Fo Tan for the China Gas Company.

The road level crossing at Mile 9 was resited to Mile 94 (14.8 m) in January 1978 for the Public Works Department in connection with road diversion works.

In connection with the reconstruction of Bridge No. 25, the mainline was diverted twice for the Highways Office of the Public Works Department and the final alignment of the main line was adjusted in September 1977 •

Typhoon and Rainstorm Damages

80.

year.

No major damage was caused by typhoons and rainstorms during the

Minor Civil Engineering Works

81.

Other items of minor civil engineering works can be found in Appendix XXI.

PERSONNEL

82.

The following increase and deletions of posts were approved during the year, bringing the total establishment to 1,040 at 31st March, 1978, an increase of 3.48% over last year's establishment of 1,005 :-

Planning and Administration Division

Addition

1

Senior Executive Officer

Strengthening the Railway's administration

Traffic Division

Addition

3

Railway Officers II

3

3

3

MM M

Assistant Railway Officers)

Head Shunters

Labourers

14

Manning the Control Room of Kowloon Terminus

Manning traffic operations in Lo Wu Marshalling Yard

Attending to lavatories at stations