APPENDIX XX Contd.
(c) Flats No. 1D and 2B were repainted and minor defects of other
flats were repaired at Wylie Court.
(a) The stand pipe of a fire hydrant at Ho Tung Lau Staff Quarters
was renewed.
(e) A gate hut was built at Sheung Shui Station on the side of level
crossing.