WAY AND STRUCTURES.

55. Maintenance. Way and Structures have been maintained in good order during the year.

56. Track Renewal. The original programme of re-railing the main line was as follows:-

13 miles

5

"

1947/48

1948/49

1949/50

сл

5

1950/51

4

99

1951/52

3 &

""

1952/53

3

22 miles

Due to late arrival of fastenings and the short supply of sleepers, the progress in 1948/49/50 was 6 miles. Up to date, the total mileage re- railed is as follows:

1947/48

1948/49

1949/50

1950/51

13 miles

41

2

""

""

31/1

""

11

miles

Eleven miles have still to be re-railed. In order to catch up

on the time lag of the 6-year programme, forty additional temporary plate- layers were engaged for a period of 6 months from March 1951.

The renewals in the main line were as follows:

95-lb rails

1,006 lengths

95-lb switches

16 sets

95-lb crossings

16 sets

14