ESTIMATE SPECIFICA-
TION.
This Estimate provides for the construction of a Public Works Department Store at Wanchai, and a Storekeeper's residence with connected Offices, also for covered sheds and a workshop, in accordance with detailed plans and specifications.
THE HONGKONG GOVERNMENT GAZETTE, 26TH FEBRUARY, 1898.
HONGKONG PUBLIC WORKS DEPARTMENT,—Continued.
ITEMS OF ESTIMATE.
QUANTITY.
RATE. AMOUNT. TOTAL.
Brought forward,
No. 2 STOREKEEPER'S HOUSE.
Excavation for foundatious,
Cement concrete in foundations,
Do. Do.
in flooring of verandah,. in surfacing,
Granite masonry, dressed beds and joints,
Do.
moulded,
Brickwork in lime mortar,............
Do. in cement mortar,
Tiled roofing complete,
Superficial feet of glazed windows,
Do. do. with jalousies,
C.
24.50 cubes. 12.25 1.25
.74
C. 18.13
C.
30.00
367.50
"2
32.00
40.00
37
13.75 squares.
11.00
151.25
7 cubes.
65.00
455.00
2.50
80.00
200.00
25
60
23.00
95
1,350.00
5
28.00
140.00
1
14
squares.
20.00
280.00
120
.42
"
50.40
135
.80
108.00
وو
Do. of braced and ledged doors, Roof trusses complete,
300
.50
150.00
2
20.00
40.00
Planked flooring complete, Allow for stairease, .
8.50
35.00
297.50
30,00
Ceiling,
Do. mantle piece,. Stoneware pipes 9" diameter,
Do.
6" do.,
Manholes complete, Traps complete, Steel joists,.
Verandah railings,
Cast iron eaves gutters,.
Down pipes including heads, etc.,
Plastering,
Oiling woodworks,.
Painting 3 coats,
25.00
25
feet.
1.20
30.00
.
100
1.00
100.00
1
15.00
15.00
2
4.00
8.00
0.50 tons.
200.00
100.00
1.25 squares.
50.00
62.50
100
feet.
.24
24.00
150
.40
60.00
6.50 squares.
12.00
78.00
20.50
4.00
82.00
19
8.50
2.00
17.00
22
3.30
72.60
Tarring 2 coats,
Black-varnishing 2 coats,
21
1.40
29.40
4 37.25
2.00
8.00
.30
11.17
Contingencies 10 %,
4,430.45 443.55
197
$9,115.00
Down pipes including heads, etc.,
White-washing 3 coats,..
No. 3 SHEDS AND WORKSHOP.
Excavation in foundations, Cement concrete in foundations,
Do. Do.
in surfacing,
channels,
Brickwork in lime mortar,
Do. in cement mortar,
Granite masonry, moulded, Tiled roofing complete, Roof trusses complete, Lead gutters,
Cast iron eaves gutters,....
Tarring 2 coats,
Black-varnishing 2 coats,
$ 4,874.00
11.25 cubes.
74
8.33
3
33
33.50 squares.
30.00 11.00
90.00
368.50
900
feet.
17
157.50
10
cubes.
23.00
230.00
2
28.00
56.00
33
1.50
80.00
120.00
34
32.50 squares.
25.00
$12.50
25
12.00
300.00
15
250
feet.
.30
75.00
225
.24
54.00
事
150
40
60.00
47 squares.
1.40
63.80
3.50
2.00
7.00
White-washing 3 coats,..
No. 4 YARD,
103
.30
30.90
Contingencies 10 %,
2,435.53 243.47
$ 2,679.00
Excavation,
Cement concrete in surfacing,
Allow for drainage,
Hongkong, 5th January, 1898.
52
17.50 cubes.
.74 squares. 11.00
12.95
572.00 800.00
Contingencies 10 %,
1,384.95 138.05
TOTAL,
$1,523.00
...S 18,191.00
R. D. ORMSBY, Director of Public Works,