370
tug would be required to insure safety in navigating Gaillard Cut provided the Canal were completed to its designated size, and excepting as specified in sections b, d and e hereof, first hour
For each succeeding quarter hour or fraction thereof (b) For towage through the Canal from or to either entrance to the Canal, anchorage in harbor, or dock, whether loaded or in ballast, per net vessel ton, Panama Canal measurement
Per displacement ton, Panama Canal measurement Minimum charge for each vessel towed
(e) The Canal authorities reserve the right to tow vessels having a ton- nage of 1,500 net tons or less, Panama Canal measurement, through the Canal at the rates specified in paragraph b, at the convenience of the Canal; also the right to take more than one vessel at one time.
(d) For tugs De Lesseps or Sanidad, first hour
For each succeeding quarter hour or fraction thereof (e) For tugs Balboa, Birdena, Coco Solo or No. 26, first hour
.$15.00 3.75
.10
.04
150.00
10.00
2.50
7.50
3.75
4. Clapets Rates for clapets, same as for tugs De Lesseps and Sanidad.
For each succeeding half hour or fraction thereof
5. Launches: (a) For Class A launches, Aspinwall, Margarita, Patrol, Pioneer, Search or Taboga, first hour
5.00
For each succeeding half hour or fraction thereof..
2.50
(b) For Class B launches, Atlantic, Barbacoas II, La Zona, Lirio, Mary B, Mary S, Pacific, Pilot, Pratique, Triscilla, Psyche, Ruth, Santa Rita or Vedette, first hour..
3.00
For each succeeding half hour or fraction thereof.
1.50
(e) For Class C launches, Aranal, Azimuth II, Bonito, Chilibre, Fla- menco, Lavis, Margaret, Snail, Nos. 7, 8, 9, 10, 11 and 12, first hour
2.00
For each succeeding half hour or fraction thereof.....
1.00
Charges to Panama Canal or Panama Railroad employees will be 70
per cent. of the above rates.
6. Barges: (a) For Class A barges having a capacity of over 2,799 cubic feet, first day
30.00
For each succeeding half day or fraction thereof
10.00
(b) For Class B barges having a capacity of over 1,799 cubic feet and less than 2,800 cubic feet, first day
20.00
For each succeeding half day or fraction thereof
5.00
(c) For Class C barges having a capacity of less than 1,800 cubic feet,
first day
10.00
For each succeeding half day or fraction thereof
2.50
(d) Each day of service to be computed on 24-hour basis.
(e) For flat barges, the same rate will apply as for open barges of the same dimensions.
7. Pangas or Whaleboats: (a) For service of pangas or whaleboats (with- out motor), first hour...
For each succeeding half hour or fraction thereof
(b) For service of pangas and whaleboats with motor, first hour
For each succeeding half hour or fraction thereof
For services during an extended period, in remote localities, or under special conditions, special rates may be made, with the approval of the Governor.
8. Rates for use of floating equipment not listed above will be furnished by the official in charge, upon approval of the Governor.
CHESTER HARDING,
Acting Governor.
1.00
.50
1.50
.75
1